Porch
September - December 2002
Nashville, TN

This piece was done on site over existing concrete steps. A footer was dug, laid with rebar and filled with rock mix concrete. The piece was started against the house and formed / carved one piece after another around to the steps. Then the center was poured and carved. This piece was done on site and as the weather became so inclimate a tent of tarps was made and heaters had to be used to facilitate setting.